| 
Wetlands Videos 2000
Back
February
11, 2000
(4.37 MB)
Taken
one mile upstream from the Lake Las Vegas Intake and 1.7 miles
downstream from the SNWA Lateral (ECS #1 site). Erosion control
structure #3, also called the Demonstration Weir, is a rock riprap
structure consisting of approximately 7,000 tons of dolomite limestone
rock (donated by Lake Las Vegas Resort) and some concrete. This
video will give you an overview of the Demonstration Weir site
as well as a peek at some of the wildlife that has already started
to make it their home.
|